Hyderabad, India
Global sourcing and export of electrical transformers
KYPER supplies transformers and allied electrical equipment to buyers, distributors and OEMs in 18 countries. Built to specification. Inspected before despatch. Shipped by the container.
Trade merchant · Custom and standard ratings · Serial supply
- 18
- Countries served
- 10MVA
- Largest rating handled
- 250+
- Containers shipped
- 30–45days
- Typical lead time
Across EMEA, Asia-Pacific and the Americas
LV, MV and HV from 10 kVA upward, dry and liquid-filled
FCL, LCL and break-bulk consignments
Ex-works to port, standard specifications
Range
What we ship
Six categories, and the ratings we work in. We quote against a specification, not against a catalogue — send one outside these bands and we will say plainly whether it can be built.
Operations
What we do
Four activities sit between a specification and a delivered transformer. KYPER holds all four.
01
We qualify the factory
Plant audit, test-bay capability and export record before a manufacturer enters the vendor base. Ratings are matched to plants that build in that capacity band routinely, not occasionally.
02
We inspect before despatch
Routine tests witnessed against the standard the specification names. In-process checks at core and winding stage. Reports issued before the container is sealed.
03
We handle the freight
Booking, stuffing, marine insurance, customs and port handling, quoted as one landed cost at the agreed Incoterm. One despatch advice, not a chain of forwarder emails.
04
We hold the specification
Repeat orders are built to the approved drawing, the same bill of materials and the same vendor. No silent substitutions between consignments.
Applications
Where it goes
Six sectors, each loading a transformer differently. Ratings are specified against the duty the application imposes, not against a nameplate in isolation.
- 01
EV Charging Infrastructure
Fast-charging sites impose heavy harmonic content and constant duty cycling on compact step-down units.
- 02
Renewable Energy
Solar inverter duty and wind step-up applications run cyclic loads across wide ambient swings.
- 03
Medical & Diagnostic
Imaging and theatre supplies need controlled leakage current and genuinely quiet operation.
- 04
Data Centres
Redundant power trains call for low-loss units holding regulation under non-linear load.
- 05
Telecom
Remote and rooftop sites need sealed, low-maintenance units that survive dust, salt air and unattended operation.
- 06
Traction & Locomotive
Rolling stock and depot supplies must take shock, vibration and rapid load reversal inside a tight envelope.
Network
Distance, made uneventful
The name comes from the Kuiper Belt — the outer edge of the solar system, where the far reaches begin. It is the part of the map that connects what is near to what is distant. That is the work: standing at the far end of a supply chain so the distance stops being the buyer's problem.