Export Services

From enquiry to arrival

Five stages sit between a specification and a receiving dock. Most import problems occur where those stages change hands. These do not change hands.

  1. 01

    Sourcing & vendor qualification

    The specification is matched against an audited vendor base — plant capability, test-bay equipment, capacity band, export record and current order book. Shortlisting is on suitability. Negotiation follows.

    • Plant and test-facility assessment before a vendor enters the base
    • Capacity-band matching — the right plant for the rating
    • Design support for bespoke ratings, drawings issued for approval
    • Commercial negotiation handled in-country, in local terms
  2. 02

    Quality inspection

    Units are checked at stage and again before despatch. Routine tests are witnessed against the standard the specification names, and results are issued before the consignment is sealed.

    • In-process checks at core assembly and winding stage
    • Witnessed routine tests — ratio, winding and insulation resistance, losses, applied and induced overvoltage
    • Dimensional, nameplate and accessory verification against approved drawings
    • Third-party inspection agencies coordinated on request
  3. 03

    Documentation

    Export paperwork is prepared, checked and issued as one pack. Incomplete documentation is the most common cause of demurrage, and it is never the buyer's job to chase it.

    • Commercial invoice, packing list and bill of lading
    • Certificate of origin and preferential-origin paperwork where applicable
    • Routine test reports and material test certificates
    • Insurance certificate, fumigation and packing declarations
  4. 04

    Freight & logistics

    Booking, inland movement, port handling and marine cover are arranged as a single line item, quoted as one landed cost at the Incoterm in use.

    • FOB, CFR, CIF and DAP terms quoted on request
    • Ocean and air freight booking with rate comparison
    • Marine insurance placed and certificated
    • Customs clearance and port handling at origin
  5. 05

    Container & bulk shipping

    Transformers are heavy, awkward and easy to damage in transit. Loading plans are drawn before stuffing, so cube and weight are used properly and units arrive intact.

    • FCL, LCL, flat-rack and break-bulk handled
    • Stuffing plans drawn to balance weight and maximise cube
    • Timber cradling, shrink wrap and desiccant to specification
    • Photographic record of stuffing and container seal

Container economics

A full container is a cheaper transformer

Freight is a large share of landed cost on medium-rating units. Consolidating a rollout into full container loads — rather than shipping as each site releases — routinely removes double-digit percentages from the per-unit landed cost. We model the difference against the delivery schedule before either route is committed.

Consolidation
Multiple ratings and accessories combined into one FCL
Scheduling
Release dates aligned to sailing schedules, not the reverse
Cube planning
Loading drawn before stuffing to avoid paying for air
Lead time
30–45 days ex-works typical for standard specifications

Next step

Tell us what you need to buy

Send a specification. Quotations are returned within two working days, with a lead time and a landed cost at your Incoterm.